|
Several road projects were completed within the township during the 2006 summer construction season. The cul-de sac on 167th St NE was completely gutted, and widened due to frost heaves making it nearly impassable each spring. It was lined with a mesh blanket material and new culvert was installed. |
|
ROAD PROJECTS |

|
New cul-de-sac's have been built on both ends of 161st Ave NW following the closure of the bridge south of the Town Hall. The bridge was closed due to it's age and condition and also the cost of replacing it. |

|
Cul- De- Sac East Of The Town Hall On 161st Ave NW |


|
167th St NE |
|
Cul- De- Sac East Of Bridge |
|
Cul- De- Sac East Of Bridge |
